Procedural Documents
This page is a collection of all RIPE NCC procedural documents. These documents contain details of how the RIPE NCC carries out various internal procedures.
-
Docs / RIPE Document StoreRIPE NCC Certification Practice Statement (CPS) for the Resource Public Key Infrastructure (RPKI)
ripe-851: RIPE NCC Certification Practice Statement (CPS) for the Resource Public Key Infrastructure (RPKI)
RipeDocument • RPKI -
Docs / RIPE Document StoreRIPE NCC Conflict Arbitration Procedure
ripe-844: RIPE NCC Conflict Arbitration Procedure
RipeDocument • arbiters -
Docs / RIPE Document StoreImplementation of RIPE Policy "Contractual Requirements for Provider Independent Resource Holders in the RIPE NCC Service Region" - Phase 3
ripe-569: Implementation of RIPE Policy "Contractual Requirements for Provider Independent Resource Holders in the RIPE NCC Service Region" - Phase 3
RipeDocument • 2007-01 -
Docs / RIPE Document StoreTest Traffic Measurements (TTM) Survey 2002
ripe-270: Test Traffic Measurements (TTM) Survey 2002
RipeDocument -
Docs / RIPE Document StoreDistributing K-Root Service by Anycast Routing of 193.0.14.129
ripe-268: This memo proposes to distribute the DNS service provided by k.root-servers.net across multiple locations in the Internet topology. It discusses the motivation for and the principles of implementation. A first inventory of detailed issues is provided in an appendix.
RipeDocument • K-root -
Docs / RIPE Document StoreRIPE NCC Routing Information Service
ripe-200: This document discusses the Routing Information Service (RIS), a project proposed as a new activity of the RIPE NCC in the RIPE NCC activity plan for 1999 and 2000.
RipeDocument • RIS -
Docs / RIPE Document StoreRIPE CENTR Proposal
ripe-177: This document aims to propose goals of and a structure for the RIPE Council of European National Top level domain Registries (RIPE CENTR), if such an organisation should be started.
RipeDocument • internet governance -
Docs / RIPE Document StoreInternet Delay Measurements Using Test Traffic, Design Note
ripe-158: This document discusses the test traffic project proposed as a new activity in ripe-144. The document gives an overview of the project, discusses the implementation and mentions a couple of points that have to be addressed in future design documents.
RipeDocument • TTM -
Docs / RIPE Document StoreStatement of Cooperation
ripe-002 defined the organisations that took part in the RIPE Coordinating Committee
RipeDocument • RIPE