About RIPE | Contact  | Search | Sitemap    
Homepage RIPE  
RIPE Community Mail Archives
search  
     
RIPE Navigation Ends
About RIPE Maillists
Maillists Archive
Global Lists
Non Active Lists
RIPE NCC Navigation Ends
Next Section
<<< Chronological >>> Author Index    Subject Index <<< Threads >>>

2nd draft Routing WG agenda - significant changes

  • From:
  • Date: Tue, 12 Sep 2000 03:52:45 EDT

 Dear colleagues,

 we found quite some overlap between the Routing and the Database WGs.
 Accordingly, we both aligned our schedules. Therefore, there are some
 changes to the agenda... please find below the 2nd draft of the Routing
 WG agenda for:

   Thursday, 14-September, 9:00      Routing WG session

 The most prominent change compared to the 1st draft is not only rearranging
 of presentations, but the 2nd slot to be run as a joint session together
 with the Database WG, dealing with transition issues to the new database.

 As usual comments, additions, changes to the agenda of the Routing WG 
welcome!
---
 R I P E  3 7   A M S T E R D A M
 Routing  Working  Group  Session
 14-September-2000   Draft Agenda

 - 1. slot -

 Note: this slot is dedicated to Routing WG issues, and is going to be held
 in room St.John's II

 A. Preliminaries (Joachim Schmitz) (5min)
    - introduction
    - participants' list
    - volunteering of scribe
    - agenda bashing
    - RIPE 36 minutes
    - actions from earlier meetings

 C. RADB Update (Gerald Winters) (20min)

 E. RIS, Status and Plans (Antony Antony, Henk Uijterwaal) (10min)

 F. Routing Registry Consistency Project
    (Shane Kerr) (10min)

 G. Study of BGP Convergence (Abha Ahuja) (20min)

 H. Internet Routing Table Analysis Update (Philip Smith) (20min)

 I. RIPE-210 - Updates with contributions from the audience
    (Christian Panigl, Philip Smith) (20min)

 J. Promoting European IP Multicast deployment - Introducing the European
    IP Multicast Initiative (EuMI)
    (Tony Ballardie) (10min)

 Note: we will slightly run overtime in the first slot with the changed
 agenda, but this is intended (the same will happen with the DB WG)

 - 2. slot -

 Note: this is a joint slot with the Database WG, and will be taking place
 in the Grand Ballroom which is big enough to hold people of both WGs

 B. RIPE Database Software Re-Implementation and Transition to RPSL
    (Andrei Robachevski, Joao Luis Silva Damas) (40min)

 Y. General I/O with Other WGs
    Transition taskforce: RIPE-181 database to new RPSL database
    - what does it mean
    - intentions
    - progress
    with input from the audience

 Z. AOB
---

 Regards
   Joachim
--- JS395-RIPE -- standard disclaimer ---




  • Post To The List:
<<< Chronological >>> Author    Subject <<< Threads >>>
 

Next Section
     About RIPE | Site Map | LIR Portal | About the RIPE NCC | Contact | © RIPE Community. All rights reserved.
RIPE.NET Homepage LIR Portal RIPE Community