About RIPE | Contact  | Search | Sitemap    
Homepage RIPE  
RIPE Community Mail Archives
search  
     
RIPE Navigation Ends
About RIPE Maillists
Maillists Archive
Global Lists
Non Active Lists
RIPE NCC Navigation Ends
Next Section

Re: Final transition steps

  • To:
    (Sean Doran)
  • From:
  • Date: Sun, 16 Apr 1995 15:59:05 -0700 (MST)
  • Cc:
    ,
    ,
    ,
    ,
    ,
    ,
    ,

> (To get the ICM DS3 up and running on time for the 21st
> (instead of before the 30th) we have some timing issues that
> are pretty critical, namely provisioning the DS3 and
> installing all the equipment.  It is unclear that this is
> possible on the MFS side (never mind the paperwork process,
> which we probably will just have to ignore in the short run).
> What is clear though is that current connectivity to
> MAE-EAST is insufficient for making 21 April a happy day --

I seriously doubt this will be a problem if you push.  We had a T3 installed
for Internet World In San Jose with 3 days notice.  MFS & PacBell were both
very cooperative.

This move up date concerns us a lot, too.  We're still waiting for MAE-west
to come online completely to complete our west coast peering arrangements, and
hoping to get connectivity to fix-west/sprint along the way soon as well.

Dave

-- 
Dave Siegel, Director of Engineering
Network (99) Operations Center
(800)638-9947  			(602)249-1190 after hours
dsiegel@localhost



 

Next Section
     About RIPE | Site Map | LIR Portal | About the RIPE NCC | Contact | © RIPE Community. All rights reserved.
RIPE.NET Homepage LIR Portal RIPE Community