Draft minutes 6th EOF meeting
- Date: Thu, 18 May 1995 11:51:13 +0200
- Return-receipt-to: dfk-acks@localhost
> Atendees:
Daniel Karrenberg RIPE NCC Daniel.Karrenebrg@localhost
> PL also explained the plans for implementing a "Euro-NAP" at the
s/plans/possibility/?
> Pennsauken, NY Sprint facility. The Pennsauken installation has
> better survivability than the MFS facilities in Wasthington DC, and
> prices and rack space are both readily available. Due to this
> facility also housing a US NAP in the post-NSFnet architecture it
> is a well-suited place to terminate high-speed european circuits.
DFK pointed out that while he personally agrees with PL's arguments
those present should be aware that PL is heavily involved with US Sprint
and therefore might be biased on some issues.
> Keith Mitchell from PIPEX commented that PIPEX has been announcing
> a subnet of the class A network 9.0.0.0 for some time already (in
> "production mode"), and the only problem so far was a slight delay
> in processing of the NACR for the NSFnet service.
GJDG pointed out that this was an 'easy' case because 9/8 was not announced
anywhere and the longer prefix was announced only by PIPEX.
|